HEADS UP: Archer Library patrons should be aware that the south-east corner of the main floor (near the government publications compact shelving) will be inaccessible to the public starting this evening (Thursday, October 16th) to allow for window replacement on the 2nd floor exterior podium level. The actual work will begin on Saturday and will extend into November. Updates regarding the completion of the window replacement will be posted here as the work progresses.
Renovations are underway in the main storage room of the
University Archives to help us to better preserve and provide access to our
collections. Special Collections materials are still accessible during the
renovations (we've moved hundreds of boxes upstairs, see photo 2) but there
will be retrieval delays for archival items still in the impacted space. Thank
you for your patience!



From Sunday, April 13th through Friday, April 25th, the Library will be open until 2:00 am for the final exam period. No library services will be provided from 11:00 pm to 2:00 am, but student assistants will staff the Help Desk during this time to monitor the main floor area and provide general assistance.
There will be complimentary tea and coffee, courtesy of Starbucks, served at 9 PM during this period (weekdays only.)
🎨 Need a break from studying?
Take a moment to relax with free coloring pages in the Archer Library Alcove, or check out our online Library Web Adventures — they're fun, quick, and stress-free! 🌟

Perfect for a little brain break during finals season. 💆♀️📚
👉 Explore here: https://library.uregina.ca/librarycontest/studybreak
Archer Library & Archives is excited to announce that new furniture is now on the 5th floor! Comfortable carrels are equipped with power outlets and storage space. Quiet and private study spaces will enhance the 5th floor as a silent red zone. Remember to use our Waitz app, check our library occupancy online or at our kiosk on the main floor to see which floors in the Library are busy!






Archer Library & Archives has a new design concept to make the 5th floor more conducive for silent study and provide more privacy.
West zone will have a new furniture arrangement and acoustic screens
Central zone will have new custom-made study carrels with acoustic screens which will replace study tables.
Acoustic panels and a new electrical track system were installed during Reading Week.
New furniture is expected to arrive later in March so stay tuned for further updates.


In preparation for the arrival of new furniture in spring 2025 on the Library’s 5th floor, installation of electrical equipment and acoustic panels will occur over the winter Reading Week (Tuesday, February 18 – Friday, February 21).
The west and central silent study areas will be inaccessible during installation of electrical raceway equipment and acoustic panels (see floorplan.) A brief power shutdown can be anticipated (impacting the 4th and 5th floors). What’s to come? Comfortable semi-enclosed study pods and accessible study pods will be available for students in the 5th floor silent zone. Sound absorbing acoustic panels will reduce distractions and create an more conducive environment for focused work.


